HO 2018-003 - Tap Project - CLI 210 S

Client: CSM Bessac
Location: Corovod - Albania
Project description

This winch is rented for a maximum pull force of 100mton.


The scope of work for this winch is: A river crossing. A pipeline will be pulled through a microtunnel.

Used products in this project

Intermittent linear winch CLI 210 S

Linear winch type CLI 210


  • IMG_1849s

Bezemer Group Holland
Bunsenstraat 49
3316 GC Dordrecht, The Netherlands
t: +31 (0) 78 618 10 00
f: +31 (0) 78 618 70 19
e: info@bezemer.com

Latest tweet @bezemergroup